The Holy Synod of the Serbian Orthodox Church

Belgrade

  • Construction works at The Holy Synod of the Serbian Orthodox Church, Belgrade
  • Construction works at The Holy Synod of the Serbian Orthodox Church, Belgrade
  • Construction works at The Holy Synod of the Serbian Orthodox Church, Belgrade
  • Construction works at The Holy Synod of the Serbian Orthodox Church, Belgrade
  • Construction works at The Holy Synod of the Serbian Orthodox Church, Belgrade
  • Construction works at The Holy Synod of the Serbian Orthodox Church, Belgrade
  • Construction works at The Holy Synod of the Serbian Orthodox Church, Belgrade
  • Construction works at The Holy Synod of the Serbian Orthodox Church, Belgrade
  • Construction works at The Holy Synod of the Serbian Orthodox Church, Belgrade
  • Construction works at The Holy Synod of the Serbian Orthodox Church, Belgrade

Smiley face

Project Details

Scaffolding type:

US®

Project Description:

For the purposes of making a mosaic on the central dome of the Temple of Saint Sava, a steel structure was developed to allow the execution of all works in the dome with the uninterrupted use of the interior space of the Temple. The inaccessibility of the surface, great height and planned longer time period of making the mosaic, created the need to form a dedicated structure to enable this work.

A birdcage on modular scaffold above the suspended structure was designed at a height of 16m from the elevation of +43.08 to 59,08m. After setting up the scaffolding several working platforms will be set up around the flange, being 59,08m the highest working platform.

Technical characteristics of the supporting steel structure and scaffolding with a large number of operating platforms in the interior of the Temple of Saint Sava carry their specificities, primarily due to the environment where the works will be carried out, and the height at which the works will be carried out.

Weight:

25 Ton

Category:

Birdcage

Client:

Konstruktor Konsalting d.o.o